Textiles & Apparel
Look at the people behind production.
Assess delivery, quality and cost alongside working conditions and traceability, from selection through ongoing review.
Explore Myanmar todayMYANMAR INDUSTRY NOW
The industry in MyanmarApparel exports and workforce recovery differ.
Garments remain an export industry, but rising export values do not describe every factory or worker. Orders and working conditions need to be read together.
Woven and knitted apparel exports rose
JETRO reports 2025 export-value growth of 2.2% for woven apparel (HS62) and 11.2% for knitted apparel (HS61), not equivalent gains in volumes or margins. [3]
Pay and working conditions remain difficult
UNDP’s 2025 study of 667 workers in Yangon and Bago reports average monthly earnings below US$100 and long hours; it is not a current wage measure for every factory. [2]
Business implications
Buyer evaluation needs factory-level staffing, wages, hours and grievance handling alongside price and delivery. More orders do not establish sustainable production.
What to watch next
Monitor repeat orders, staff turnover, remediation after audits and input and transport costs.
Evidence behind the industry.
In March 2026, the ILO continued follow-up to its 2025 Article 33 resolution on Myanmar. [1]
Understand how the business connects.
Where is value created, and who needs it?
Start with the role, process and customer.
- Specification / order
- Fabric / trims
- Cut / sew
- Inspect / deliver
Buyer-supplied-material processing and factory-sourced production allocate cash, quality and delivery risk differently. Confirm responsibilities rather than relying on contract labels.
Different segments, different questions.
ILLUSTRATIVE SEGMENTS| SEGMENT / MODEL | VALUE TO DELIVER | WHAT TO VALIDATE |
|---|---|---|
| Processing contracts | Deliver process control and quality using specified materials and designs. | Allocate responsibility for shortages, design changes and rejects. |
| Sourcing-inclusive production | Coordinate fabrics and trims through finished goods. | Review funding, sample approval, freight, clearance and payment terms. |
| Small-lot / domestic production | Prioritise specification and replenishment for uniforms or specialist uses. | Compare minimum quantity, sizes, reorders and colour consistency. |
An editorial comparison framework, not a determination of eligibility, licensing or currently available opportunities.
Look beneath the headline numbers.
Line balance
Identify work-in-progress bottlenecks across cutting, sewing and finishing rather than treating one faster step as higher total output.
Accepted-unit cost
Include rework and rejects, with safeguards that protect worker safety and rights under price pressure.
Materials and collection
Model cash from material purchase to buyer acceptance and payment; clarify advances, balances and acceptance.
Turn information into specific checks.
Three starting points for checking an individual project.
Factory & process
Check factory authority, process capacity, subcontracting, quality control and production plans.
Working conditions
Review pay records, hours, safety and accessible grievance channels with site-level evidence.
Contracts & improvement
Agree inspections, defects, corrective actions and verification before setting continuation criteria.
A sequence for moving forward.
- Standards
- Factory review
- Sample
- Follow-up
An illustrative planning sequence, not a complete legal procedure or a commitment to a specific scope of work.
Start with evidence. Decide the next step.
Define what to test and what evidence to keep before scaling.
Use an approved sample for a small run, reviewing process, quality and working conditions together.
First-pass acceptance, rework time, delivery variance, working hours and grievance response.
Expand only after quality, timing, worker protection and buyer sourcing requirements are met.
SOURCES & DATESSources and reference periods.
Sources and reference periods.
Updated using public sources available and checked through 14 October 2026. Publication dates and reference periods are shown separately.
Read figures within their original scope. Practical checks are editorial guidance, not determinations of permissions or transaction eligibility. This page does not update automatically.
- 01INTERNATIONAL LABOUR ORGANIZATION
Follow-up to the Article 33 resolution on Myanmar ↗
Published: 2026-032026 follow-up to the 2025 Article 33 resolution concerning workers’ rights in Myanmar.
- 02UNDP
Stitches of Struggle and Hope ↗
Published: 2025-06-02Report based on interviews with 667 garment workers; not an audit of every factory in the country.
- 03JETRO
2026年版 世界貿易投資動向シリーズ:ミャンマー ↗
Published: 2026-10-02Commodity trade in calendar 2025. Changes in nominal US-dollar values are not changes in output volumes or profitability.